Project Lists

Baker Street Residential

The list below is categorised into the following groups of similar projects to demonstrate experience

 Commercial  Infrastructure  Mixed Use  Residential  Retail
 Commercial

London Dock – St George City (under construction)

Principal Designer Adviser within former docklands area of East London

Pennington Street Warehouse a listed building being converted into office/commercial spaces

Green Park Hotel – London & Regional

Refurbishment of existing hotel building including asbestos removal, structural alterations, services alterations and strip out of building followed by reconstruction and fit out works

Dept W – Schroders UK Real Estate Fund

Refurbishment and internal alterations to provide Cat A standard office from ground floor to roof level, façade repairs and cleaning, along with structural alterations.  New entrance area where the old Spiegel Halter building is located which will contain new lifts to upper floors.  The basement level will be refurbished as shell and core ready for tenant fit-out.

Saville Row – Savrow Holdings

Reinstatement and refresh of Cat A standard fit out to office areas following tenant lease expiring

Broadstone Place – Chiltern Firehouse

Internal fit out and alterations to building to provide additional staff changing area and associated office area providing Principal Designer service in 2016.  Provision of Principal Designer service in 2020 for the construction of an entrance canopy and glazed walkway

Morning Lane – Manhattan Loft

Construction of two new retail units on a brownfield site adjacent to London Overground Railway with provision of CDM Co-ordinator then principal Designer Advisor Service

Beacons – BMO Global Asset Management

Units 1 & 2 – Strip out and refurbish internal areas of retail units
Unit 2 – Cat A+ fit out to first floor, to include teapoint and meeting room installation and M&E works
Unit 3 – Dilapidation works following expiry of tenant lease

Bonhill Street – Legal & General Property Fund / Tetris Bluu

Carrying out both CDM Advisor service and Principal Designer Advisor service on strip out and refurbishment of internal office areas within multi tenanted office buildings in Central London

Cannon Bridge House – IG

Provision of Principal Designer Service on phased refurbishment of toilet blocks within existing operating office block

St Georges Court / 10 Bloomsbury Way – London & Regional Properties

Major refurbishment of an eight story office building (formerly MoD tenant) to include structural alterations allowing the new usage to have double height retail units on ground floor with offices above along with a new lightweight structure to provide an additional level of office space on ninth floor.

CDM (planning supervisor) role on same building during its previous reconfiguration and refurbishment in 2000.

55 Baker Street, London W1 – London & Regional Properties

The landmark office building – formerly headquarters of Marks and Spencer – was redeveloped as a major £130m 815,000sq ft. mixed use scheme – see downloadable project profile sheet

 Infrastructure

Langley Park Chippenham – Chippenham Properties

Demolition of buildings and re-profiling of land to provide additional car parking including service diversions

Camberwell Old Cemetery – London Borough of Southwark

Remedial environmental works to remove contaminated waste and remodelling to provide new area for future graves

Kingsmere Development, Bicester – Countryside Properties

Provision of CDM services on new greenfield development for infrastructure and co-ordination with plot developers

Little Island site – Keltbray

Equivalent CDM Co-ordinator service on the demolition of part of former Pfizer site in Cork working with client (Tapella Ltd) and contractor (Keltbray)

West Norwood Cemetery – London Borough of Lambeth

Improvements to the entranceway and internal roads

GLA Information Pods – Greater London Authority

Health and safety support services along with coverage of CDM role for the installation and usage of the information pods across London during the Olympic period.

A453 Widening – Laing O’Rourke

Provision of CDM Co-ordinator Services on behalf of the design and build contractor Laing O’Rourke as appointed to them by the Highways Agency. Role was undertaken within the design period up to “Notice to Proceed”.

M25 DBFO Road Widening Scheme – Connect Plus Ltd

Part of consortium carrying out phased widening of M25 motorway including the A1(M) Hatfield Tunnel, M25 Junctions 16 to 23 – widening from 3 to 4 lanes in each direction and M25 Junctions 27 to 30/31 – widening from 3 to 4 lanes in each direction

The widening work undertaken within the existing M25 highway boundary and will included earthworks, retaining measures, bridge strengthening, drainage works, road pavement, utilities, gantries and motorway communications, road restraint (safety fencing), road lighting, street furniture, signs and road markings.

Work to the Hatfield Tunnel included:

Improving the emergency communication and escape facilities, fire points and cross passages; sustainability in materials and finishes with regard to structural walls and ceilings including secondary cladding and fire protection; refurbishment and alteration of existing pump stations and balancing ponds; Compliance with the Road tunnel Safety Regulations 2007 and Disability Discrimination Act including new lighting, signage and ventilation.

LFB PFI 9 Stations – Blue3

CDM Co-ordinator on project for replacement of 9 fire stations on a phased project – see downloadable project profile sheet.

Project “Pegasus”, Luton Airport – London Luton Airport Operations Ltd

Various construction and building works within and adjacent to existing terminal at Luton Airport.   Works included:   Internal alterations to existing terminal buildings, conversion of existing unused first floor area to retail area (airside), new aircraft Pier on existing pavement area, new Immigration building and access walkways, new two level transfer building between terminal buildings.   All M & E works with associated other services.

LUL Flood Mitigation

Section engineer on the installation of flood mitigation works to the Bakerloo and Northern lines as they pass under the River Thames either side of Hungerford Footbridge.

Excavation of the river bed and installation of precast concrete units, up to 400 tonnes, and associated piling and scaling prevention measures.

Hull Ro-Ro King George V Dock – ABP

Construction of a new roll on roll off berth in the River Humber of steel piles and cross head beams welded in-situ.

 Mixed Use

One Blackfriars – St George City

The overall project consists of 3 buildings.  A tower which is a 50 story building comprised of 274 homes plus a managed resident and guest facilities built above a three level basement that incorporates a car park.  A six story comprising 161 rooms. A podium building as commercial units and residents facilities

Brace Dien – Newcrest Estates

Construction of a two story commercial / retail / residential unit together with associated access and parking arrangements, landscaping and other ancillary works

Barking Town Square – Phase 1 – Redrow Regeneration Limited

Redevelopment around former library site, also see Phase 2 project – see downloadable project profile sheet.

Barking Town Square – Phase 2 – Redrow Regeneration (Barking) Ltd

The continuation of the town centre development of Barking Town centre, also see Phase 1 project – see downloadable project profile sheet.

 Residential

London Dock – St George City (under construction)

Principal Designer Advisor within former docklands of East London on the construction of the following schemes:

Building D a residential development, up to 12 stories, constructed above retail and basement plant room

Building C2/C3 a residential development comprising two buildings totalling 191 residential units up to 17 stories with ground floor commercial units and single level basement to accommodate plant areas and parking

Building F The construction of a building with four cores to provide ~360 residential units varying heights up to 17 stories with ground floor retail units sitting above a single story basement.  Pennington Street Warehouse a listed building being converted into office/commercial spaces

Malgavita Southall – Redrow London (under construction)

Principal Designer Advisor on the construction of a residential development of 5-22 storied perimeter buildings including commercial ground floor with ~302 residential units above

Guilford Street – Guilford Limited

Conversion of two existing houses to form 9 self contained dwellings

Ebbsfleet – Newcrest Ebbsfleet

Construction of 46 residential units, 10 Townhouses and 5 retail units and associated car parking spaces, landscaping and associated works

Kingsland Road – Hope Moon

Refurbishment and reconfiguration or residential accommodation above an operational restaurant unit

Dropmore House – Dropmore Estates

CDM Co-Ordinator for the restoration and refurbishment works to the main house, outbuildings, infrastructure and associated works to allow the main house to be re-occupied.  Various parts of the work are an Grade I and Grade II listed structures

Alfa Laval Site – Carlton Properties

Redevelopment of a former industrial / commercial site into a mixed use scheme in West London adjacent to M4 elevated roadway.

Phase 1 includes partial site clearance and demolition with construction of new private and affordable housing units along with infrastructure.

Southmere Village – Gallions Housing Association

The demolition phase of existing residential and retail units from the estate. Followed by the construction of new homes for sale and rent, plus new community facilities including shops, library, health centre and community hall within Thamesmead, South-East London.

Asher Loftus Way – Jewish Care Trust

CDM Co-ordinator role on the provision of a new 48 bed care building within the grounds of an existing care home along with external road and landscaping re-configuration, amendment to existing buildings and all associated services and ancillary works.

Woking Homes PFI – Kier/Thames Valley Housing

CDM duties through from the initial bid to “preferred bidder” stage on the PFI scheme. The site was designed as part private sales to be sold by Kier Homes and the other part as affordable units owned and managed by Thames Valley Housing.

Granite Wharf, Greenwich – London & Regional Properties

Three phases of a major mainly residential scheme.  Construction and development of 667 residential apartments (private and affordable), office space, health & fitness club, crèche, and a hotel including landscaping and enhancement of public transport facilities in the vicinity of the site. Construction and development of a relocated boatyard. Re-establishment of dry docks and flood defence wall.

150 High Street, Stratford, East London – Genesis Housing Group

Major mixed use development close to Stratford Town Centre and opposite the Olympics site on the Waterworks River.   – see downloadable project profile sheet.

39-41 South Street

The conversion and renovation of two houses into one – see downloadable project profile sheet.

Peverel Retirement

Provision of CDM style service on notifiable and non-notifable projects to cover Clients protocols across the portfolio of their varied residential sites. This included setting up pro-forma to meet proposed works and Client liaison.

 Retail

Hucknall – Newcrest Estates

The construction of four retail units along with external adjacent roadways / parking areas on greenfield site

Berryfields – Newcrest Estates

The project consisted of the construction of two buildings to form a single large retail unit and a building of 5 smaller retail units along with external works of roadways, parking, retail service areas and services

Intu – Health and safety audits of CDM process on behalf of client on major developments at retail centres including Potteries, Metrocentre, Eldon Square, Glades, Harlequins and Broadmarsh centres

Oakridge – Newcrest Estates

The construction of a new retail food store and a small parade of seven retail units along with external adjacent roadways and car parking area.

Centrale Croydon – Hammerson

Provision of CDM duties for the enabling works and proposed development of the existing shopping centre in central Croydon

County Square Shopping Centre, Ashford – ING Retail Estate Management

An extension to the existing shopping centre- see downloadable project profile sheet.

Retail Centre, Bradley Stoke – Tesco Stores

Redevelopment and extension of retail centre.   – see downloadable project profile sheet.

Co-Op Retail

CDM Co-ordinator service on a variety of minor refurbishments across the “SW and Wales” Region on food and petrol retail units. Also including a few larger stores and some new units converted from other previous uses.

Mitchells and Butlers

Provision of CDM services on a call off basis for the Client across a range of their public house retail units during refurbishment.

The list above includes work carried out under previous employment.  More details on projects and services can be supplied on request

Back to top